[CONFIRM] · [CONFIRM]

Eight Drake

New dwelling · DA · Built

[CONFIRM — one or two sentences: what the block made difficult, and how the plan answered it.]

[CONFIRM — the legacy page is a ten-image photo gallery with no text. Three beats needed: the site, the design, the approval. Built and photographed, so this is one of the two entries that carries real photography.]

Planning something similar?

How we handle new dwelling projects

Free site review

Send us the address

We'll tell you what your site can carry before you spend anything on drawings.

An automatic reply comes back within a minute with the zone, height, floor space ratio and minimum lot size mapped to that address. Or call 0403 993 876.