Fees

What design and approval actually costs

Almost nobody in this industry publishes a price. We do, because the alternative is a phone call where you find out we're twice what you budgeted, and neither of us gets that hour back.

These are indicative fees for a straightforward site. A fixed fee is confirmed per project once we've seen the address — constraints move them, and we'd rather tell you that here than in a variation later.

Our fees

All figures exclude GST.

ProjectApproval and documentationAdd Construction Certificate
New dwelling — CDCfrom $5,800from $6,800
New dwelling — DAfrom $6,800from $8,800
Secondary dwelling (granny flat) — CDCfrom $4,300from $5,800
Secondary dwelling — DAfrom $5,400from $8,800
Alterations and additions — DAfrom $4,800from $6,800
Dual occupancy — CDCfrom $10,800from $12,800
Dual occupancy — DAfrom $12,800from $16,800
Multi-dwelling, 3+ — DAfrom $18,800from $24,800

Work outside a fixed scope is charged at $180/hr for the Director and $130/hr for a senior drafter.

Feasibility, priced separately

ServiceFeeWhat you get
Desktop planning feasibilityfrom $990 + GSTControls, pathway and constraints on one address, in writing.
Concept feasibility / yield testfrom $2,800 + GSTTested envelope and indicative yield before you commit to a scheme.

How that compares

Published Sydney rates: a draftsperson charges 1–2% of construction cost, a building designer 3–5%, an architect 8–15%. On a 200 m² new dwelling at mid-range Sydney construction rates, our CDC fee lands near 1% — draftsperson pricing for building-designer scope.

That is a deliberate position, not a discount we'll claw back later. Where it doesn't hold is granny flats and small alterations, which sit at 3% or so of the build, because the planning work on a small job is not proportionally smaller.

What else you'll pay, and to whom

Our fee is one line on a longer list. These are the others, and they're paid to third parties, not to us:

ItemTypical rangePaid to
Land survey$1,500 – $3,500Registered surveyor
Structural engineering$1,500 – $3,000Engineer
Structural — second-storey addition$3,000 – $6,000Engineer
Stormwater and drainage design$1,500 – $5,000Civil engineer
BASIX and NatHERS assessment$700 – $1,300Assessor
Geotechnical / soil classification$300 – $800Geotechnical engineer
Private certifier — CDC$1,500 – $4,000Certifier
Certifier — CC and principal certifier$2,000 – $5,000Certifier
Council lodgement fee — DAby cost of worksCouncil
Long service levy0.25% over $25,000Long Service Corporation
Development contributions$15,000 – $35,000 per dwellingCouncil
Specialist reports if triggered$800 – $5,000 eachConsultant

Bushfire, flood, heritage, acoustic and traffic reports are only needed where the site triggers them. Part of the site review is telling you which ones you're up for.

A straightforward DA package, all in

Public guides put the whole approval stack at $8,500 to $23,000 for a residential DA, and past $30,000 on a constrained site. That is the number to budget against, not our fee on its own.

If you want the whole picture including construction, site works and statutory charges, the construction cost estimator builds it line by line.

Fees current at September 2026 and reviewed annually. Third-party ranges are indicative and set by those providers, not by PlanLand.

Want a fixed fee on your site?

Send the address. We'll run the pathway, confirm the scope and give you a fixed number.